Shannon Airport WWTW-Design, Build & Operate

 

Shannon DBO
Value: €2,500,000 (Civil: €1,100,000)
Client:

Shannon Airport Authority, Shannon Airport, Shannon, Co. Clare.

Consultant:

Nicholas O’Dwyer Ltd., Nutgrove Office Park, Nutgrove Avenue, Rathfarnham, Dublin 14

Completion Date:

October 2007

Involvement:

Main Contractor / PSCS, 100% participation

This Contract involved the design and construction of a new wastewater treatment plant at Shannon Airport to cater for a population equivalent of 5000 people. The Project was procured as a 20 year Design, Build and Operate Contract.  Ward & Burke Construction were responsible for all civil design and construction. The M&E works were carried out by Response Engineering.

An outlying pumping station (Knockbeg) was constructed to pump the effluent to the Treatment Works, via a 1500m rising main, with treated final effluent pumped and discharged at this site also.

Civil construction on the treatment works site consisted of:

  • Aeration tanks
  • Clarifiers,
  • Inlet works,
  • Pump sumps,
  • Control Building
  • Treatment process:
    • Automatic Screening
    • Grit Removal
    • Forward Feed Pumps
    • Biotank
    • Clarifier
    • Sludge thickening
    • Final Effluent pumping to outfall

 