Access Road to Castle Street Carpark- Castlebar
Value : €300,000
Obviously specialist in nature, the work in this instance consisted
of jacking vertically an insitu concrete bridge deck 700t in weight,
a total of 1.2m distance onto permanent steel bearing piles. Temporary
works were designed in-house as were the permanent connections to the
permanent supports.
All work on site was supervised and carried out directly.