Featured Contract is in Cork where pipelaying, in extremely difficult conditions, was required. A combination of permanent piles for pipe support, temporary sheetpiling for trench support and wellpoint dewatering for water control was required on this site. Pipe diameter was 900mm Ductile Iron at a depth 7m below ground.

Rossnowlagh Sewerage Scheme