TUAM REGIONAL WATER SUPPLY SCHEME

Tuam Regional Water Supply Scheme 2
Headford Reservoir
Headford Reservoir

Project Profile

Tuam Regional Water Supply Scheme-Extension to Headford

Value: €12,800,000
Client:

Galway County Council, County Buildings, Prospect Hill, Galway. Contact: Mr. Dermot Collins Ph.: 091-509000

Consultant:

Ryan Hanley Consulting Engineers, Taylors Hill, Galway Contact: Mr. Michael Joyce Ph.: 091-587116

Completion Date:

July 2007

Involvement:

Main Contractor / PSCS, 100% participation

Project Description:

(a)Watermains

  • 59,500m of 400/350/300/250/200/150 mm diameter uPVC Class C.
  • 4,805m of 280m diameter Fusion Welded HPPE Pipe (SDR 17.6)

(b) Treatment Works

  • Upgraded the existing water treatment works at Luimnagh comprising of Filters, 3 tanks of reinforced concrete, partly underground and partly overground, each tank to contain media and water volume of approximately 180m³, surface dimensions 7m by 6m each.
  • Observation and pipe gallery: A two storey reinforced concrete framed building with reinforced concrete floors, infill blockwork and pitched roof.  Total floor areas 240m2.
  • 62m of 600mm diameter ductile iron rising main bypass of the raw water balancing tank.

(c) Reservoirs (2 No.)

  • L-Reservoir, Knockcarrigeen:  10,200m3 reinforced concrete storage reservoir at Knockcarrigeen complete with inlet/outlet pipework and a valve/meter chamber to permit inlet and outlet flow metering.
  • Headford Reservoir[tower]: 720m3 reinforced concrete storage reservoir complete with quick acting ball float valve, associated inlet / outlet and flow measurement pipework.

(d) Knockacarrigeen Pumping Station

  • Pumphouse with pitched slated roof and reinforced concrete frame, floor area 148 m2.
  • Control building.

(e) Site Works

  • Site access roads, site drainage, pipework and ancillary siteworks at the Luimnagh Water Works, L-Reservoir, and Headford Reservoir sites.

Project Profile

Tuam Regional Water Supply Scheme-Extension to Headford

 

Particular Challenges:

  • Liaison with numerous stakeholders along the route of the pipeline including Galway County Council divisions, National Parks and Wildlife, Fisheries, local residents/landowners, ESB, Telecom, etc.
  • Construction of a 3km section of pipeline through an SAC (Special Area of Conservation).
  • Working in an existing Water Treatment Works environment and ensuring maintenance of the water supply during tie-in cross-overs/ cross-connections.  (This Plant supplies water to Galway City and all of North County Galway)

Luimnagh Treatment Works
Luimnagh Treatment Works

Knockcarrigeen Reservoir
Knockcarrigeen Reservoir


Ward & Burke Construction Ltd, Stradbally East, Kilcolgan, Co. Galway, Ireland
Phone: +353 (0) 91 776827 | Fax: +353 (0) 91 776828
Email:
© Ward & Burke Construction Ltd 2004 -2007